Commercial EV Dynamic Load Management & Curtailment Sizer

Avoid costly DNO network reinforcement and main cut-out fuse failure. This tool calculates available supply headroom, models dynamic curtailment waterfalls under peak building demand, enforces the IEC 61851-1 6A minimum pilot floor, and evaluates three-phase neutral conductor loading under single-phase charging diversity.

Statutory Regulation 722.311: Diversity may only be applied to electric vehicle charging equipment where an automated load management system is installed that monitors incomer demand and dynamically curtails charging current.
1. Building Supply & Baseline Demand
2. Connected EV Fleet
3. DLM Controller Protocol

Dynamic Curtailment Telemetry

DLM Dynamic StatusCALCULATING...
Curtailed Cut-Out Threshold--
Building Peak Base Load--
--
Unconstrained Fleet Demand--
Active Bay Allocation
Allocated Current per Active Bay--
Effective Charging Speed--
Queue & Load Shedding State--
Estimated Neutral Current (Unbalanced)--
Evaluating DLM curtailment waterfall...
INCOMER CAPACITY UTILISATION0%
Base Load Allocated EV Safety Reserve
BS 7671 Section 722 Dynamic Load Management Formulation
BS 7671:2018+A4:2026 Section 722 & IET Code of Practice 5th Edition
AM2 PORTFOLIO & DESIGN AUDIT FORMATTRANSPARENT FIRST-PRINCIPLES MATHS

Scenario: 200A 3-phase commercial incomer, 10% safety buffer (180A trip limit), 110A baseline demand, 6 × 7.4 kW and 2 × 22 kW EV charge points (8 vehicles charging simultaneously):

  • Unconstrained Fleet Demand: 6 single-phase bays balanced across 3 phases = 2 bays/phase (64A) + 2 three-phase bays (64A) = 128A per phase.
  • Available EV Headroom: 180A - 110A = 70A per phase.
  • Dynamic Curtailment: Fleet demand (128A) exceeds available headroom (70A). The DLM controller proportionally curtails all active vehicles from 32A down to approx 17.5A per bay.
  • Statutory Safety: Total incomer load is maintained at exactly 180A, fully preventing upstream DNO fuse operation without cutting power to charging bays.
Formula & factors cross-checked against BS 7671:2018+A4:2026 Section 722 & IET Code of Practice 5th Edition. Free of black-box approximations.
Earthing & PME Advisory (Regulation 722.411.4.1): For EV charging equipment connected to a PME (TN-C-S) supply, protective multiple earthing shall not be used for protective earthing of charge points located outdoors unless open-PEN detection devices complying with BS 7671:2018+A4:2026 Reg 722.411.4.1 are incorporated.
Statutory Standards: BS 7671:2018+A4:2026 Section 722.311 • IET Code of Practice 5th Edition • IEC 61851-1