REFERENCE // PRINTABLE FIELD CHECKLISTSHSE GS38 • BS 7671:2018+A3 • BS 5266 • BS EN 60204-1
A4 PRINT-OPTIMIZED INSTRUMENTS

Printable Electrical Field Checklists

Standardized engineering inspection and quality control sheets designed for on-site execution. Use on screen or click "šŸ–Øļø Print / Save as PDF" to generate a clean, unbranded, high-contrast A4 hardcopy sheet.

HSE GS38 SAFE ISOLATION VERIFICATION CHECKLIST

Electricity at Work Regulations 1989 (EAWR Regs 12, 13 & 14) • HSE Guidance Note GS38

Permit / Job Ref: ___________________
Date & Time: ___________________
Client / Site Location: ________________________________________________
Equipment / Circuit ID: ________________________________________________
Duty Holder / Authorised Person: ________________________________________
Competent Electrician / Engineer: ____________________________________

10-Step Sequential Verification Procedure

StepCheckRequired Safety Action & Standard ProcedureInitials / Time
1Permission & Consultation: Inform duty holder / occupants of isolation and confirm permission to isolate supply without operational disruption._______________
2Identify Point of Isolation: Verify correct circuit breaker, isolator, switch-fuse or distribution board using verified drawings and labels._______________
3Open Isolator / Switch: Switch the local switch-disconnector or circuit protective device to the open (OFF) position._______________
4Lock Off & Retain Key: Secure the isolator in the OFF position using an approved lockout hasp and unique-key safety padlock. Retain the key on your person._______________
5Attach Warning Notice: Fix a prominent warning tag stating your name, contact phone number, date, and reason for lockout._______________
6Prove Voltage Indicator (Pre-Check): Test an approved 2-pole voltage detector (BS EN 61243-3 / GS38 with ≤ 4mm exposed tips & finger guards) against a known proving unit._______________
7Test All Conductors Dead: Measure between all line conductors, neutral, and protective earth at point of work:
L1–L2 [ ] • L2–L3 [ ] • L3–L1 [ ] • L1–N [ ] • L2–N [ ] • L3–N [ ] • L1–E [ ] • L2–E [ ] • L3–E [ ] • N–E [ ]
_______________
8Re-Prove Voltage Indicator (Post-Check): Immediately re-test the voltage detector against the proving unit to confirm tester remained 100% operational during test._______________
9Check Secondary / Stored Energy Sources: Confirm absence of backfeeds from UPS systems, PV inverters, standby generators, or charged DC capacitors._______________
10Commence Work / Permit Sign-Off: Safe working area established. Conductors proven dead. Safe to commence electrical intervention._______________

Electrician / Inspector Signature:

I confirm that safe isolation has been executed strictly in accordance with EAWR 1989 and HSE GS38.

De-Isolation & Handover Signature:

Lockout padlock removed and installation safely re-energized following successful verification.

MINOR ELECTRICAL INSTALLATION WORKS TEST SCHEDULE

BS 7671:2018+A3:2024 • Part 6 (Inspection and Testing of Minor Additions and Alterations)

Cert Ref: ___________________
Date of Test: ___________________
Client Name: _______________________________________________________
Installation Address: ________________________________________________
Earthing System: [ ] TN-S   [ ] TN-C-S (PME)   [ ] TT
Supply Ze / Ipf: Ze: ________ Ω • Ipf: ________ kA

Section 1: Description of Minor Works & Circuit Parameters

Description of Work:____________________________________________________________________________________
DB Designation / Way: _______________Device Type & Rating: MCB / RCBO Type ____ / ____ ABreaking Capacity: ____ kAConductor CSA: Live: ____ mm² / CPC: ____ mm²

Section 2: On-Site Test Results Schedule

Continuity (Ω)Insulation Resistance (MΩ @ 500V DC)Loop & FaultRCD Operating Characteristics
r1, rn, r2 (Ring)R1 + R2R2 (Wander)Live – LiveLive – EarthNeutral – EarthMeasured Zs (Ω)Trip @ 1× IΔn (ms)Trip @ 5× IΔn (ms)
r1: ____
rn: ____
r2: ____
________ Ω________ Ω________ MΩ________ MΩ________ MΩ________ Ω
(Max: _____ Ω)
________ ms
(Max 300 ms)
________ ms
(Max 40 ms)
Test Instrument Serial #: _______________________________________________
Calibration Expiry Date: ______________________________________________

Declaration of Conformity:

I certify that the minor works detailed above comply with BS 7671:2018+A3:2024 and does not impair existing installation safety.

Inspector Name & Qualification:

Name: ________________________ • Position: ________________________

EMERGENCY LIGHTING 3-HOUR DISCHARGE INSPECTION LOG

BS 5266-1:2016 • BS EN 50172 / BS 5266-8 (Annual Full Duration Test Register)

Log Sheet Ref: ___________________
Inspection Date: ___________________
Building / Premises Name: ____________________________________________
Floor / Area Inspected: ________________________________________________
Responsible Person / Duty Holder: ____________________________________
Testing Engineer / Contractor: _______________________________________

Luminaire Inspection & 3-Hour Discharge Schedule

Unit IDLuminaire Location / RoomType (M/NM)LED Charge1-Hr Check3-Hr CheckPass/FailDefects & Remedial Actions
EL-01___________________________M / NM[ ] OK[ ] PASS[ ] PASSP / F___________________________
EL-02___________________________M / NM[ ] OK[ ] PASS[ ] PASSP / F___________________________
EL-03___________________________M / NM[ ] OK[ ] PASS[ ] PASSP / F___________________________
EL-04___________________________M / NM[ ] OK[ ] PASS[ ] PASSP / F___________________________
EL-05___________________________M / NM[ ] OK[ ] PASS[ ] PASSP / F___________________________
EL-06___________________________M / NM[ ] OK[ ] PASS[ ] PASSP / F___________________________
EL-07___________________________M / NM[ ] OK[ ] PASS[ ] PASSP / F___________________________
EL-08___________________________M / NM[ ] OK[ ] PASS[ ] PASSP / F___________________________

Engineer Completion Signature:

I confirm that all luminaires above underwent a continuous 3-hour discharge test in compliance with BS 5266.

Premises Handover & Re-charge Verification:

Main normal lighting restored and battery charging circuits operational (allow 24h recharge for full autonomy).

MOTOR & CONTROL PANEL COMMISSIONING & QC SHEET

BS EN 60204-1:2018 (Machinery Electrical Equipment) • BS EN 60034 • PUWER 98

Machine Ref / Tag: ___________________
Commissioning Date: ___________________
Motor Make & Model: ________________________________________________
Rated Power & Voltage: ________ kW • ________ V (Δ / Y)
Full Load Current (FLC): ________ A • Rated RPM: ________
Starting Method: [ ] DOL   [ ] Star-Delta   [ ] Soft-Start   [ ] VFD

Pre-Energization Cold Checks

CheckInspection Item / Testing RequirementMeasurement / ValueStatus
Shaver / Bolt Torque: Foundation bolts, coupling alignment, and terminal box screws torqued.Specified: _______ Nm[ ] PASS
Winding Resistance Balance: Measure phase-to-phase cold resistance balance (U1-U2, V1-V2, W1-W2).U: ____ Ω • V: ____ Ω • W: ____ Ω[ ] PASS
Insulation Resistance (Phase to Earth): Test @ 1000V DC for 1 minute (≥ 200 MΩ required).Measured: ________ MΩ[ ] PASS
Thermal Overload Relay Setting: Dial set to match motor nameplate FLC (or FLC × 0.58 for Star-Delta).Dial Set: ________ A[ ] PASS
Safety Interlocks (BS EN 60204-1 §9.2): E-stop Category 0/1 hardwired trip and anti-restart test.Cat 0 / Cat 1 / STO[ ] PASS

Live Energization Running Tests

CheckLive Running Verification ParameterMeasured ValueStatus
Phase Sequence & Rotation: Confirm shaft rotation matches machine direction arrow.L1 – L2 – L3 [CW / CCW][ ] PASS
Running Currents (Full Load): Measure line current on all 3 phases under operating load.IL1: ____ A • IL2: ____ A • IL3: ____ A[ ] PASS
Bearing Temperature & Vibration: Check for abnormal acoustic noise or excessive heating.Drive end: ____ °C • Non-drive: ____ °C[ ] PASS

Commissioning Engineer:

I verify that this drive train and control panel meet BS EN 60204-1 safety standards.

Production / Plant Manager Sign-off:

Equipment accepted for operational service.

UK ELECTRICAL NEWS

News, calculators, 3D visual physics labs, and BS 7671 amendment tracking for UK electrical engineers.

About & ContactToolsReferenceTrackerYouTubeGuidesLabSources

āš™ļø Educational & engineering reference only. Not installation design, certification, or professional advice. Always verify against current BS 7671, harmonised standards, and manufacturer datasheets.

UK Electrical News is an independent publication, not affiliated with IET, BSI, NICEIC, NAPIT, ECA, ELECSA or cited manufacturers. News summaries link to original sources.